Hemlo's BRF analysis

Brf Framnäs 9

Org. no. 716418-1690 · Solna

Weaknesses presentBased on the 2025 annual report

metricPercentile.heading

  • Lower debt per m² than 61% of associations in Solna
  • Higher fee per m² than 99% of associations in Solna
  • Smaller maintenance fund than 90% of associations in Solna
  • Lower equity ratio than 100% of associations in Solna

Association facts

Municipality
Solna
Built
1945
Apartments
13
Total area
596 m²

Identified risks

  • Very high leverage with negative equityCritical
  • Very high interest rate sensitivity in the event of future refinancingCritical
  • A high fee level indicates a pressured cost structure.High

Details, assessments and suggested actions are part of the full analysis.

Full analysis

Create a free account to unlock every metric and the full assessment.

  • Debt per square metre
  • Fee per square metre
  • Savings per square metre
  • Fee trend
  • Loan structure and rate terms
  • Interest-rate sensitivity
  • Maintenance plan
  • Planned renovations