Hemlo's BRF analysis

Brf Mjörnbo Allé

Org. no. 769635-8857 · Lerum

Stable associationBased on the 2025 annual report

Top 37% in Lerum

metricPercentile.heading

  • Higher debt per m² than 85% of associations in Lerum
  • Lower fee per m² than 69% of associations in Lerum
  • Smaller maintenance fund than 73% of associations in Lerum
  • Higher equity ratio than 88% of associations in Lerum

Association facts

Municipality
Lerum
Built
2019
Apartments
54
Total area
3 183 m²

Identified risks

  • Very high debt per square metreCritical
  • Very high interest rate sensitivity when interest rates riseHigh
  • The loans mature within a short period of time, concentrated in the near term.High

Details, assessments and suggested actions are part of the full analysis.

Full analysis

Create a free account to unlock every metric and the full assessment.

  • Debt per square metre
  • Fee per square metre
  • Savings per square metre
  • Fee trend
  • Loan structure and rate terms
  • Interest-rate sensitivity
  • Maintenance plan
  • Planned renovations