Hemlo's BRF analysis

Brf Piloten 1

Org. no. 769628-9664 · Örebro

Acceptable, with remarksBased on the 2024 annual report

metricPercentile.heading

  • Higher debt per m² than 80% of associations in Örebro
  • Lower fee per m² than 69% of associations in Örebro
  • Higher equity ratio than 83% of associations in Örebro

Association facts

Municipality
Örebro
Built
2017
Apartments
60
Total area
4 569 m²

Identified risks

  • Very high debt per sq mCritical
  • Extreme interest-rate sensitivity at higher interest ratesCritical
  • Planned rent increases signal cost pressureHigh

Details, assessments and suggested actions are part of the full analysis.

Full analysis

Create a free account to unlock every metric and the full assessment.

  • Debt per square metre
  • Fee per square metre
  • Savings per square metre
  • Fee trend
  • Loan structure and rate terms
  • Interest-rate sensitivity
  • Maintenance plan
  • Planned renovations