Hemlo's BRF analysis

HSB BOSTADSRÄTTSFÖRENING TINGVALLEN I LUND

Org. no. 745000-2014 · Lund

Acceptable, with remarksBased on the 2025 annual report

metricPercentile.heading

  • Lower fee per m² than 78% of associations in Lund
  • Larger maintenance fund than 96% of associations in Lund
  • Lower equity ratio than 87% of associations in Lund

Trend over time

Key figures from the co-op's recent annual reports.

Fee/m²746 kr/m²
+4% over 1 yr20242025
Debt/m²3 304 kr/m²
-30% over 1 yr20242025
Equity ratio16 %
0 pp over 1 yr20242025

Association facts

Municipality
Lund
Built
1967
Apartments
414
Total area
39 794 m²

Identified risks

  • High interest-rate sensitivity can put pressure on feesHigh
  • Low maintenance reserve in combination with major projectsHigh
  • The structural replacement work is not completed in a building built in 1967.High

Details, assessments and suggested actions are part of the full analysis.

Full analysis

Create a free account to unlock every metric and the full assessment.

  • Debt per square metre
  • Fee per square metre
  • Savings per square metre
  • Fee trend
  • Loan structure and rate terms
  • Interest-rate sensitivity
  • Maintenance plan
  • Planned renovations