Hemlo's BRF analysis

Brf Ylle 1

Org. no. 769640-3844 · Örebro

Stable associationBased on the 2025 annual report

metricPercentile.heading

  • Higher debt per m² than 92% of associations in Örebro
  • Lower fee per m² than 72% of associations in Örebro
  • Smaller maintenance fund than 100% of associations in Örebro
  • Higher equity ratio than 98% of associations in Örebro

Association facts

Municipality
Örebro
Built
2024
Apartments
81
Total area
5 826 m²

Identified risks

  • Very high loan-to-value per m²Critical
  • Very high interest rate sensitivityCritical
  • Several large loans will fall due within a short time windowHigh

Details, assessments and suggested actions are part of the full analysis.

Full analysis

Create a free account to unlock every metric and the full assessment.

  • Debt per square metre
  • Fee per square metre
  • Savings per square metre
  • Fee trend
  • Loan structure and rate terms
  • Interest-rate sensitivity
  • Maintenance plan
  • Planned renovations