Hemlo's BRF analysis
HSB Brf Idun i Mora
Org. no. 716413-1232 · Mora
Strong associationBased on the 2025 annual report
Top 37% in Mora
metricPercentile.heading
- Higher debt per m² than 67% of associations in Mora
- Higher fee per m² than 93% of associations in Mora
- Smaller maintenance fund than 93% of associations in Mora
Trend over time
Key figures from the co-op's recent annual reports.
Fee/m²860 kr/m²
+16% over 2 yr2023–2025
Debt/m²1 882 kr/m²
-12% over 2 yr2023–2025
Equity ratio33 %
-1 pp over 2 yr2023–2025
Association facts
- Municipality
- Mora
- Built
- 1983
- Apartments
- 26
- Total area
- 1 958 m²
Identified risks
- Very low maintenance fund for major future measuresCritical
- Increasing risk of plumbing replacement in the 1983 buildingHigh
- A large portion of the loans will fall due soonHigh
Details, assessments and suggested actions are part of the full analysis.
Full analysis
Create a free account to unlock every metric and the full assessment.
- Debt per square metre
- Fee per square metre
- Savings per square metre
- Fee trend
- Loan structure and rate terms
- Interest-rate sensitivity
- Maintenance plan
- Planned renovations