Hemlo's BRF analysis

HSB Brf Idun i Mora

Org. no. 716413-1232 · Mora

Strong associationBased on the 2025 annual report

Top 37% in Mora

metricPercentile.heading

  • Higher debt per m² than 67% of associations in Mora
  • Higher fee per m² than 93% of associations in Mora
  • Smaller maintenance fund than 93% of associations in Mora

Trend over time

Key figures from the co-op's recent annual reports.

Fee/m²860 kr/m²
+16% over 2 yr20232025
Debt/m²1 882 kr/m²
-12% over 2 yr20232025
Equity ratio33 %
-1 pp over 2 yr20232025

Association facts

Municipality
Mora
Built
1983
Apartments
26
Total area
1 958 m²

Identified risks

  • Very low maintenance fund for major future measuresCritical
  • Increasing risk of plumbing replacement in the 1983 buildingHigh
  • A large portion of the loans will fall due soonHigh

Details, assessments and suggested actions are part of the full analysis.

Full analysis

Create a free account to unlock every metric and the full assessment.

  • Debt per square metre
  • Fee per square metre
  • Savings per square metre
  • Fee trend
  • Loan structure and rate terms
  • Interest-rate sensitivity
  • Maintenance plan
  • Planned renovations